Metal Union Conditions
January 1, 2025
General terms and conditions of delivery issued by the Royal Metal Union, filed with the Rotterdam court registry.
Article 1: Applicability
1.1. The Metaluniel member that uses these terms is referred to as the contractor. The other party is referred to as the client.
1.2. These terms and conditions apply to all offers made by a Metaluniel member, to all agreements that he concludes and to all agreements that result from them, all of which applies insofar as the Metaluniel member is the contractor.
1.3. In the event of a conflict between a provision of the concluded agreement and these terms and conditions, the provision of the agreement shall prevail.
1.4. Only Metaalunie members are allowed to use these terms and conditions.
Article 2: Offers
2.1. All offers from the contractor are non-binding and revocable, including those offering a deadline for acceptance. The contractor has the right to revoke its offer up to two working days after the day on which acceptance is received.
2.2. The prices quoted by the contractor in the offer are expressed in euros, exclusive of sales tax and other government fees or taxes. The prices are further exclusive of travel, accommodation, packaging, storage and transport costs, loading, towing, unloading and assistance with customs formalities.
2.3 Unless otherwise specified, the offer does not include: a. ground-, pit-, demolition-, breaking-, foundation-, masonry-, timber-, plasterer-, painter-, repair- or any other construction work; b. the installation of connections for gas, water, electricity, internet or other infrastructure facilities; c. measures to prevent or limit damage to or theft or loss of items present at or near the work site; d. the removal of materials, soil, building materials or waste; e. vertical and horizontal transport.
Article 3: Confidentiality
3.1. All information provided by or on behalf of the contractor to the client (such as offers, designs, images, drawings and know-how) of any kind and in any form whatsoever is confidential. The client shall use this information solely for the execution of the agreement. He shall not disclose or reproduce the information.
3.2. If the client violates an obligation under paragraph 1, he is liable for a direct enforceable fine of €25,000 per violation. The contractor may claim this fine in addition to damages under the law.
3.3. The Client must return the information referred to in paragraph 1 at the first request, within a period set by the Contractor, at the Contractor’s discretion, or destroy it in a manner determined by the Contractor, without being allowed to retain a copy in any form whatsoever. In the event of a violation of this provision, the Client shall be liable to the Contractor for a direct and enforceable fine of € 1,000 per day. The Contractor may claim this fine in addition to damages under the law.
Article 4: Advice and information provided
4.1. The Client cannot derive any rights from the advice and information provided by the Contractor that do not relate to the assignment.
4.2. If the client provides information to the contractor, the contractor may, when submitting a bid and executing the agreement, assume that this information is correct and complete.
4.3. The Contractor is not obliged to warn of, or independently investigate any inaccuracies in the assignment, defects and ineligibility of items originating from the Client, or errors or defects in plans, drawings, calculations, specifications or execution instructions provided by the Client.
4.4. The Client indemnifies the Contractor for any claims by third parties related to (the use of) information provided by or on behalf of the Client. This includes, but is not limited to, advice, instructions, drawings, calculations, designs, materials, trademarks, samples and models. The Client shall compensate the Contractor for all damages suffered by the Contractor. This also includes the full costs of litigation.
Article 5: Delivery time
5.1. All delivery times, including those stated in these terms and conditions, such as a delivery date, week, month, period or execution period, are indicative. In the event of any delay, the client must at all times notify the contractor of any failure to meet the delivery deadline.
5.2. The delivery time only applies if the client and the contractor have reached an agreement on all commercial and technical details in a timely manner, all information, including final and approved drawings and the like, is in the possession of the contractor, all items made available by the client have been received by the contractor in a timely manner, the agreed (term) payment has been received in a timely manner, and the other conditions for the execution of the contract have been met. If the delivery time no longer applies, the contractor may determine a new delivery time in accordance with its own schedule.
5.3. The delivery time no longer applies if there are other circumstances that the contractor was unaware of when he stated the delivery time, and those circumstances fall to the account and risk of the client, including a change in the assignment, additional or less work, or suspension by the contractor. If the delivery time no longer applies, the contractor may set a new delivery time in accordance with his schedule.
5.4. The Client must reimburse the Contractor for all costs and damages incurred by the Contractor as a result of a change in the delivery time as referred to in paragraphs 2 and 3, without the need for a notice of default.
5.5. Exceeding the delivery time does not entitle the client to compensation for damages or the entire or partial termination of the contract. The client indemnifies the contractor against claims from third parties arising from exceeding the delivery time.
Article 6: Delivery and transfer of risk
6.1 Delivery takes place at the moment the contractor makes the item available at his business premises to the client and has informed him thereof. The item is then at the client’s risk.
6.2. If the contractor, after the conclusion of the agreement, still provides the transport in full or in part at the request of the client, or if the client is helpful in this (such as storage, loading, towing, or unloading), this is at the expense and risk of the client. The client can insure themselves against these risks.
6.3. If, after the delivery, there is transport carried out by or on behalf of the client, and the contractor must have (transportation) documents in possession of the client, the client must make those documents available to the contractor upon first request and free of charge.
6.4. If there is a case of exchange and the principal holds the item to be exchanged while awaiting delivery of the new item, the risk of the item to be exchanged remains with the principal until the moment when he has delivered it to the contractor. If the principal is unable to deliver the item to be exchanged in the condition in which it was when the agreement was concluded, the contractor may terminate the agreement in whole or in part.
Article 7: Price change
The Contractor may pass on to the Client an increase in cost-determining factors that occurred after the conclusion of the agreement. The Client must pay the price increase upon the Contractor’s first request.
Article 8: Force majeure
8.1. If the contractor is unable to fulfill his obligations due to a circumstance beyond his actual control, this cannot be attributed to him and there is a case of force majeure. In that case, the contractor is not liable for the damage suffered by the client as a result. The client is also not entitled, subject to the provisions of the fourth paragraph of this article, to terminate the agreement in that case entirely or partially.
8.2. The circumstances referred to in the first paragraph of this article include, in any case, (civilian) war (danger), terrorism, riots, outbreaks of infectious diseases and the resulting government measures or advice, natural disasters, extreme weather conditions, import or trade restrictions, explosion, fire, water damage, sabotage, cybercrime, disruption of digital infrastructure, disruptions in the supply of energy, (partial) loss, theft or loss of tools, materials or information, defects in machinery, road blockages, blockages of rail and waterways or airports, strikes or work stoppages, staff shortages and the circumstance that third parties engaged by the contractor, such as suppliers, subcontractors and transport companies, or other parties to whom the contractor is dependent, do not or do not comply with their obligations in time.
8.3. The Contractor has the right to suspend the performance of its obligations if it is temporarily prevented by force majeure from fulfilling its obligations towards the Client. Once the situation of force majeure has ended, the Contractor will fulfill its obligations as soon as its schedule allows.
8.4. If force majeure exists and performance becomes permanently impossible or has lasted for more than six months, the contractor is entitled to terminate the agreement with immediate effect in whole or in part. In such cases, the client is entitled to terminate the agreement with immediate effect, but only for that part of the obligations that has not yet been fulfilled by the contractor.
8.5. The parties are not entitled to compensation for any damage suffered or to be suffered as a result of force majeure, suspension or dissolution within the meaning of this article.
Article 9: Additional work
Additional work is calculated based on the prices that apply to the contractor at the time the additional work is performed. The client must pay the price for the additional work upon the contractor’s first request.
Article 10: Execution of the work
10.1. The Client ensures that the Contractor can carry out its work safely, uninterruptedly, continuously and at the agreed time. The Client shall, at its own expense and risk, ensure that:
a. all permits, exemptions and other decisions that are necessary to carry out the work in a timely manner have been obtained. The client is obliged to provide a copy of the aforementioned documents to the contractor upon the contractor’s first request; b. he informs the contractor in writing and in a timely manner about all (safety) regulations applicable at the location; c. the contractor is provided with the necessary personnel, tools and equipment (such as gas, water, electricity, internet, access roads suitable for any necessary transport, lifting and hoisting cranes, sanitary facilities and a lockable dry storage room) when carrying out his work; d. all work necessary for the execution of the work that is not included in the agreement has been carried out in a timely manner.
10.2 The Client bears the risk and is liable for damage to and theft or loss of all items located at or near the place where the work is being performed or at another agreed location, such as the item delivered or to be delivered, tools, materials intended for the work, or equipment used during the execution of the work. This does not apply if the Client proves that the damage, theft, or loss was caused by the Contractor itself.
10.3 Without prejudice to paragraph 2 of this article, the client must take sufficient insurance against the risks mentioned in that paragraph. If damage occurs, the client is obliged to report it immediately to his insurer for further processing and settlement.
Article 11: Delivery of the work
11.1. The work shall be considered completed if: a. the client has approved the work; b. the work has been put into use; if part of the work has been put into use, that part shall be considered completed; c. the contractor has informed the client in writing that the work has been completed and the client has not, within 14 days of the date of this notification, written to the contractor that the work has not been approved; d. the client does not approve the work due to minor defects or missing parts that can be repaired or delivered within 30 days and that the commissioning of the work is not hindered by them.
11.2. The Contractor is not obliged to provide the Client with a file within the meaning of Article 7:757a of the Dutch Civil Code regarding the built and to be delivered construction work (a ‘transfer or completion file’).
11.3. If the client does not approve the work, he is obliged to make this known in writing, stating the reasons, to the contractor. The client must allow the contractor the opportunity to deliver the work in question.
Article 12: Liability
12.1. If the contractor is liable in any way whatsoever, that liability is limited at all times as specified in the following articles.
12.2. If the contractor has any insurance concluded by him or on his behalf that provides coverage, the contractor’s obligation to compensate for damage is limited to the amount that is paid under that insurance in the relevant case.
12.3. If the contractor does not have insurance as referred to in the previous article, or if, for any reason whatsoever, no amount is paid under such insurance, the obligation to compensate for damage is limited to a maximum of 15% of the contract sum (excluding VAT). If the agreement consists of parts or separate deliveries, this obligation is limited to a maximum of 15% (excluding VAT) of the contract sum of the part or separate delivery in connection with which the contractor’s liability arose. In the case of a long-term agreement, the obligation to compensate for damage is limited to a maximum of 15% (excluding VAT) of the contract sum over the last twelve months preceding the event causing the damage.
12.4. Not eligible for compensation: a. consequential damage. Consequential damage includes, but is not limited to: stagnation damage, lost production, lost profit, missed savings and subsidies, tax losses, costs that were wasted in vain, internal costs incurred by the client, reduced goodwill and reputational damage, fines, damage resulting from the client’s liability towards third parties, damage related to the damage, destruction or loss of data or documents, transport costs and travel and accommodation costs, storage costs, costs for replacement equipment and labor, and costs associated with recall campaigns; b. nuisance damage. Damage attributable to supervision includes damage caused by or during the execution of the work to items being worked on or to items located in the vicinity of the place where work is being carried out; c. damage to or caused by or with equipment made available to the contractor; d. damage caused by intent or wilful recklessness of auxiliary personnel or subordinate employees of the contractor; e. damage to material supplied by or on behalf of the client, including as a result of a defective operation, assembly, assembly or installation.
The client can, if possible, insure against these damages.
12.5. The Client indemnifies the Contractor against all claims by third parties arising from a defect in a product supplied by the Client to a third party and of which the products or materials supplied by the Contractor are part. The Client must compensate all damages incurred by the Contractor in this regard, including the full costs of the defense.
12.6. Any claim for damages by the client lapses upon the mere passage of twenty-four months from its occurrence, unless the client has filed that claim with the competent court before the expiration of that period.
Article 13: Warranty and other claims
13.1 Unless otherwise agreed in writing, the contractor is responsible for the proper execution of the agreed performance for a period of six months after (the) delivery, as further detailed in the following articles.
13.2. If the parties have agreed on different warranty conditions, the provisions of this article apply, unless and insofar as this is contrary to those different warranty conditions.
13.3. The Client must, without charge, provide all cooperation to the investigation by the Client or on behalf of the Contractor of a complaint from the Client regarding the performance performed; failure to do so will result in the termination of all rights of the Client in connection with that complaint.
13.4. If the contractor has rejected a complaint regarding the performance performed on good grounds, the client must reimburse all reasonable costs incurred in connection with investigating the complaint.
13.5. If the agreed performance has not been properly performed, the contractor will choose whether to perform it again properly, replace the delivered item in whole or in part, or credit the client with a reasonable portion of the contract sum.
13.6. If the contractor chooses to still perform the performance properly or to replace the delivered item in whole or in part, the client will in all cases provide him with the opportunity to do so. The contractor determines the method and time of execution itself. If the agreed performance (including) the processing of material provided by the client, the client must deliver new material at their own expense and risk.
13.7. Goods that are repaired or replaced by the contractor must be sent to the contractor by the client. The transport, shipment, disassembly and assembly are at the expense and risk of the client. Additionally, the travel, accommodation and travel time are at the expense of the client. The contractor is entitled to demand security or advance payment for these costs.
13.8. The Contractor is only obliged to perform the warranty if the client has fulfilled all his obligations.
13.9. a. Warranty is excluded for defects that are the result of: - normal wear and tear; - improper use; - improper maintenance; - installation, (re)assembly, modification or repair by the client or by third parties; - defects in or inadequacy of goods, materials or tools originating from, or prescribed by, the client. b. No warranty is given on: - goods delivered that were not new at the time of delivery; - the inspection, repair and revision of goods; - goods for which a factory warranty has been granted; - goods for which a guarantee has been granted by third parties to the client.
13.10. The provisions in paragraphs 3 to 8 of this article shall apply mutatis mutandis to any claims by the client based on failure to perform, non-conformity or any other basis.
Article 14: Obligation to file a complaint
14.1 The Client may in no event make any further claim regarding a deficiency in the performance if he has not complained in writing to the Contractor within fourteen days of discovering or reasonably should have discovered the deficiency.
14.2. The Client must, at the risk of forfeiting all rights, complain in writing to the Contractor within the payment period about the invoice. If the payment period is longer than thirty days, the Client must complain in writing within thirty days of the invoice date at the latest.
Article 15: Non-collected items
15.1. Upon the expiry of the delivery period, the Client is obliged to take physical possession of the item subject to the agreement at the agreed place.
15.2. The Client must provide all necessary assistance free of charge to enable the Contractor to deliver the work.
15.3. Items that have not been collected are stored at the client’s expense and risk.
15.4. In the event of a violation of the provisions set out in paragraph 1 or 2 of this article, after the contractor has given the client a notice of default, the client shall be liable to the contractor for a fine of €250 per day, with a maximum of €25,000. This fine may be claimed in addition to damages under the law.
Article 16: Payment
16.1 Payment is made at the place of establishment of the contractor or in an account designated by the contractor.
16.2 Unless otherwise agreed, payment shall be made within 30 days of the invoice date.
16.3. If the client fails to fulfill their payment obligation, they are obliged, instead of paying the agreed price, to comply with a request from the contractor to make a deposit.
16.4. The right of the principal to offset his claims against the contractor or to suspend the performance of his obligations is excluded, unless there is a moratorium on payments or bankruptcy of the contractor or statutory debt restructuring applies to the contractor.
16.5. Regardless of whether the contractor has fully performed the agreed-upon performance, everything that the client is or will be obligated to pay to him under the agreement is immediately due and payable if: a. a payment deadline has been exceeded; b. the client fails to meet his obligations under Article 15; c. the client fails to provide security at the first request of the contractor in accordance with Article 17 of these terms and conditions; d. bankruptcy or suspension of payment of the client is requested; e. attachment of assets or claims of the client is placed;
f. the principal (company) is dissolved or liquidated; g. the principal (natural person) makes the request to be admitted to legal debt restructuring; is placed under curatorship or has passed away.
16.6. If the Client is late with payment, it is due interest on the amount to be paid to the Contractor starting from the day following the agreed deadline for payment until the day on which the Client has paid the payment. If the parties have not agreed on a deadline for payment, interest is due from 30 days after the due date. The interest is 12% per year, but is equal to the statutory interest if it is higher. In calculating the interest, a portion of the month is considered a full month. Every year after the end of the year, the amount for which interest is calculated is increased by the interest due for that year.
16.7. The Contractor is entitled to set off its debts to the Client against claims of companies affiliated to the Contractor with the Client. In addition, the Contractor is entitled to set off its claims against the Client against debts that companies affiliated to the Contractor owe the Client. Furthermore, the Contractor is entitled to set off its debts to the Client against claims of companies affiliated to the Client. Affiliated companies are all companies that belong to the same group within the meaning of Article 2:24b of the Dutch Civil Code and a participation in the meaning of Article 2:24c of the Dutch Civil Code.
16.8. In the event of late payment, the client is liable to the contractor for all non-judicial costs, with a minimum of €75.
These costs are calculated over the principal based on the following table: - over the first €3,000,- 15% - over the amount exceeding €6,000,- 10% - over the amount exceeding €15,000,- 8% - over the amount exceeding €60,000,- 5% - over the amount exceeding €60,000,- 3%
The actual out-of-court costs are due, if they are higher than the calculation above indicates.
16.9. If the contractor is fully or partially successful in a legal proceeding, all costs incurred by him in connection with this procedure shall be borne by the client.
Article 17: Guarantees
17.1. The Client is obliged, upon the first request of the Contractor, to provide sufficient security for all payments that the Client is obligated to pay to the Contractor under the agreement. If the Client does not comply with this within the stipulated period, he will immediately become in default. In that case, the Contractor has the right to terminate the agreement and recover its damages from the Client.
17.2. The Contractor remains the owner of the delivered goods until the client has fulfilled its obligations under any agreement with the Contractor, including claims such as damages, fines, interest and costs.
17.3. If, after the goods have been delivered to the client by the contractor in accordance with the agreement, the client has fulfilled his obligations, the retention of title to these goods shall resume if the client fails to fulfill his obligations under a later concluded agreement.
17.4 As long as there is a retention of title on the delivered goods, the client cannot object to or alienate them outside of their normal business operations. This provision has a property law effect.
17.5. After the contractor has invoked his retention of title, he may reclaim the goods delivered. The client will provide all cooperation to that end.
17.6. In the event of a violation of the provisions set out in paragraph 5 of this article, upon the contractor having given notice of default to the client, the contractor shall be liable to pay a fine of €250 per day for each violation, with a maximum of €25,000. This fine may be claimed in addition to damages under the law.
17.7. The Contractor has a right of lien and a right of retention on all matters that he holds or will receive from the Client, regardless of the reason, and on all claims that he has or may have against the Client.
Article 18: Intellectual property rights
18.1. The Contractor is deemed to be the creator, designer, inventor or discoverer of the works, models, signs or inventions created under the agreement. The Contractor has the exclusive right to apply for a patent, trademark or model.
18.2 Upon execution of the agreement, the Contractor shall not transfer any intellectual property rights to the Client.
18.3. If the performance to be provided by the contractor (including) consists of the delivery of computer software, the source code will not be transferred to the client. The client obtains a non-exclusive, worldwide and perpetual user license for the computer software solely for the purpose of the normal use and proper operation of the item.
18.4. It is not permitted for the client to transfer the license or to grant a sub-license. This provision has a legal effect regarding goods. Only in the case of resale of the item for which the contractor has supplied the computer software, does the license pass to the acquirer of the item under the same conditions and restrictions as set forth in this article, provided that the buyer of the item has accepted these conditions in writing.
18.5. The Contractor is not liable for any damage suffered by the Client as a result of a breach of intellectual property rights of third parties.
18.6. The Client indemnifies the Contractor for any claim by third parties relating to an infringement of intellectual property rights.
Article 19: Transfer of rights or obligations
The Client may not transfer or pledge rights or obligations under any article of these general terms and conditions or the underlying agreement(s), without the prior written consent of the Contractor. This provision has a property law effect.
Article 20: Termination or cancellation of the agreement
20.1 The Client is not entitled to terminate or cancel the agreement in whole or in part.
20.2. The Contractor may agree to terminate the agreement upon a request. In that case, the Client shall be liable to pay a fee of at least 20% of the agreed or budgeted price. The Contractor is entitled to demand a higher fee or to impose further conditions on its agreement.
Article 21: Applicable law and competent court
21.1. Dutch law applies. The Vienna Sales Convention (C.I.S.G.) or any other international regulation whose exclusion is permitted does not apply.
21.2. The Dutch civil court with jurisdiction in the place of establishment of the contractor shall exclusively hear disputes arising from or related to the agreement.